Corrected from: PLCDesigner V3.21
Response of the new version:
The menu item "Manual control" is available again in PLC Designer.
What happens?
The "Manual Control" menu item is no longer available.
When does the behaviour occur?
During commissioning, the function of a connected axis should be checked manually.
Which products are affected?
PLC Designer from V3.20.0
Short-term measures:
The manual control can still be used from the EASY Starter.
Evaluation/Recommendations:
Automatic Translation